1 Citation, commencement and extent

(1)    This Order may be cited as the Electricity Act 1989 (Exemption from the Requirement for a Generation Licence) (Gunfleet Sand) (England and Wales) Order 2007 and shall come into force on 1st May 2007.

(2)    This Order does not extend to Scotland.

NOTES
Initial Commencement
Specified date

Specified date: 1 May 2007: see para (1) above.

2 Interpretation

2Interpretation

In this Order—

“the Act” means the Electricity Act 1989;

“Gunfleet Sands Wind Farm” means the offshore wind farm referred to in the letter of 20th August 2003 sent to the Department of Trade and Industry for and on behalf of Gunfleet and to be located at Ordnance Survey map reference TM 225087 on the sand bank known as Gunfleet Sand, which lies approximately 7 kilometres south east of Clacton-on-Sea, Essex;

“Gunfleet” means Gunfleet Sands Limited, registered in England and Wales with number 04019207;

“total system in England and Wales” has the same meaning as it has in the Electricity (Class Exemptions from the Requirement for a Licence) Order 2001.

NOTES
Initial Commencement
Specified date

Specified date: 1 May 2007: see art 1(1).

3 Exemption from section 4(1)(a) of the Act

3Exemption from section 4(1)(a) of the Act

Exemption is granted from section 4(1)(a) of the Act (prohibition of unlicensed generation of electricity for supply) to Gunfleet in respect of the Gunfleet Sands Wind Farm.

NOTES
Initial Commencement
Specified date

Specified date: 1 May 2007: see art 1(1).

4 Conditions on exemption

4Conditions on exemption

The exemption granted by article 3 to Gunfleet is subject to compliance with the following conditions—

(a)    that Gunfleet does not hold a licence under section 6(1)(a) of the Act (licence authorising generation of electricity for supply);

(b)    that Gunfleet Sands Wind Farm is connected to the total system in England and Wales and (except in circumstances outside the reasonable control of Gunfleet) does not export more than 100 megawatts of electrical power to it at any time.

NOTES
Initial Commencement
Specified date

Specified date: 1 May 2007: see art 1(1).

Signature

Truscott

Parliamentary Under Secretary of State for Energy

Department of Trade and Industry

21st March 2007

EXPLANATORY NOTE

EXPLANATORY NOTE (This note is not part of the Order)

This Order grants an exemption from the requirements of section 4(1)(a) of the Electricity Act 1989 (which prohibits the generation of electricity for supply without a licence) to Gunfleet Sands Limited in respect of a wind farm to be located on Gunfleet Sand, a sand bank some 7 kilometres south east of Clacton-on-Sea, Essex.

A regulatory impact assessment in respect of exemptions from the requirements of section 4(1)(a) of the Electricity Act 1989 was prepared in 2001 and can be obtained from the Energy Markets Unit, Bay 220, Department of Trade and Industry, 1 Victoria Street, London, SW1H 0ET. Copies have been placed in the libraries of both Houses of Parliament.