4Conditions on exemption(1) The exemption granted by article 3 to National Wind Power is subject to compliance with the conditions specified in paragraph (2) below.
(2)
(a) National Wind Power is not a licensed generator.
(b) The North Hoyle generating station is connected to the total system and is not normally capable of exporting more electrical power than 100 megawatts to the total system, disregarding power temporarily provided in excess of 100 megawatts due to technical circumstances outside the reasonable control of National Wind Power.
NOTES
Initial Commencement
Specified date
Specified date: 8 October 2003: see art 1(1).
Electricity92
Natural Resources, Energy & Utilities Law92